7 – Steps

Overview of Onboarding Process

Steps To Your Dream Home

Step 1 – Initial Inquiry

Objective: Understand your needs and establish communication.

1.Preliminary Consultation: Discuss project type, budget, and timeline.

1

Step 3 – Contract Signing

Objective: Finalize terms and onboard the client.

1.Agreement Preparation: Include scope, budget, payment milestones, timelines, and penalties.

2.Legal Compliance: Ensure local building standards and approvals are met.

3.Payment Initiation: Collect advance payment to start the project.

3

Step 2 – Site Visit

Objective: Evaluate the site and gather necessary details.

1.Site Inspection:
– Measure dimensions, assess soil, utilities, and terrain.

– Take photos and create a site map.

2.Client Discussion: Understand vision, challenges, and restrictions.

3.Documentation: Deliver a report with observations and recommendations.

2

Step 4 – Feasibility Study & Proposal

Objective: Present feasibility, costs, and timelines.

1.Feasibility Study:

– Conduct soil and structural tests.
– Verify CMDA and local regulations.

2.Preliminary Designs: Share a concept plan or 3D visualization.

3.Budget Estimate: Breakdown: Materials, labor, and other costs.

4.Proposal Submission: Formal document outlining scope, timeline, and payment terms.

4

Step 5 – Project Execution

Objective: Execute the project as per the approved plan.

1.Planning Phase:
– Finalize detailed designs and project schedule.
– Obtain permissions and approvals.

2.Execution Phase:
– Regular site inspections and progress reports.
– Maintain transparency with the client.

3.Quality Assurance:
Adhere to timelines, safety, and material standards.

5

Step 6 – Pre-Handover Phase

Objective: Prepare the project for client delivery.

1.Final Touches:
– Complete painting, plumbing, electricals, and finishing.
– Conduct snagging to address defects.

2.Client Walkthrough: Organize a walkthrough to ensure satisfaction.

3.Handover Documentation: Provide as-built drawings, maintenance manuals, and warranties.

6

Step 7 – Final Handover & Post-Support

Objective: Deliver the project and ensure post-handover satisfaction.

1.Official Handover:

– Organize ceremony if required.
– Deliver keys and documents.

2.Post-Support: Offer periodic inspections and warranty services.

7